"ID","Title","Fiscal Year(s)","Fiscal Year Funding Amount","Legal Citation / Subdivision","Appropriation Language","Proposed Measurable Outcome(s)","Measurable Outcome(s)","Proposed Outcomes Achieved","Other Funds Leveraged","Source of Additional Funds","Direct Expenses","Administration Costs","Recipient Board Members","Number of full time equivalents funded","Recipient","Recipient Type","Body","About the Issue","Project Details","Start Date","End Date","Source","Status","Updates","Details/Reports","First Name","Last Name","Organization Name","Street Address","City","State","Zip Code","Phone","Email","Activity Type","Administered by","Media","Counties Affected","LSOHC Section","Watershed","URL","Advisory Group Members and Qualifications","Board Members and Qualifications","Conflict of Interest Contact","Conflict of Interest Disclosed" 18528,"2013 SWAG - Clearwater County",2013,10519,,,,,,,,,,,.04,"Clearwater Soil and Water Conservation District","Local/Regional Government","The goal of this project is to establish data sets to evaluate the Aquatic Recreational Use of Mallard, Sucker, and Ozawindib Lakes in southeastern Clearwater County.",,,2013-04-01,2015-06-30,"Clean Water Fund",Completed,,,Nathan,Nordlund,CSWCD,"312 Main Ave. N. Ste. 3 ",Bagley,MN,56621,218-694-6845,nathan.nordlund@mn.nacdnet.net,Monitoring,"Minnesota Pollution Control Agency",,Clearwater,,"Mississippi River - Headwaters",http://www.legacy.mn.gov/projects/2013-swag-clearwater-county,,,, 18547,"2013 SWAG - Headwaters Science Center - Upper Mississippi Riverwatch",2013,27890,,,,,,,,,,,.28,"Headwaters Science Center (HSC)","Non-Profit Business/Entity","The goal of this project is to complete a two-year data set for physical, bacterial, and water chemistry sampling for the Intensive Watershed Monitoring Plan to aid MPCA’s assessment of the aquatic health of the Mississippi Headwaters(HUC 07010101) Watershed. ",,,2013-04-24,2015-06-30,"Clean Water Fund",Completed,,,James,Owen,"Headwaters Science Center (HSC)","413 Beltrami Avenue NW ",Bemidji,MN,56601,"(218) 444-4472",,"Assessment/Evaluation, Monitoring, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Beltrami, Cass, Clearwater, Hubbard, Itasca",,"Mississippi River - Headwaters",http://www.legacy.mn.gov/projects/2013-swag-headwaters-science-center-upper-mississippi-riverwatch,,,, 845,"Cass County Lake and Stream Monitoring Program",2010,198971,,,,,,,,,,,1.75,"Cass County Environmental Services Department","Local/Regional Government","This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites. ",,,2010-04-01,2012-06-30,"Clean Water Fund",Completed,,,John,Ringle,"Cass County Environmental Services Department",,,,,"(218) 547-7241",john.ringle@co.cass.mn.us,Monitoring,"Minnesota Pollution Control Agency",,"Aitkin, Becker, Beltrami, Carlton, Cass, Clearwater, Crow Wing, Hubbard, Itasca, Morrison, Otter Tail, St. Louis, Todd, Wadena",,"Crow Wing River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters",http://www.legacy.mn.gov/projects/cass-county-lake-and-stream-monitoring-program,,,, 10008253,"Clearwater River Watershed Restoration and Protection Strategy (WRAPS) Public Notice",2019,7500,,,,,,,,,,,.005,"Red Lake Watershed District","For-Profit Business/Entity","This project will produce a final Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategy (WRAPS) report that will be utilized by local government units for water planning purposes during the Board of Water and Soil Resources One Water One Plan process for the Clearwater River Watershed. The TMDL study and WRAPS report will guide the local water planning process with regards to prioritizing water resources that are in need of water quality improvement and protection, identifying strategies for those implementation targets, and developing water quality goals that can be measured. Ultimately, this will result in improved water quality in the Clearwater River Watershed. ",,"Clearwater River Watershed ",2019-07-01,2020-07-31,"Clean Water Fund",Completed,,,Denise,Oakes,MPCA,"714 Lake Ave Ste 220","Detroit Lakes",MN,56501,"(218) 846-8119",,"Technical Assistance","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Pennington",,"Clearwater River",https://www.legacy.mn.gov/projects/clearwater-river-watershed-restoration-and-protection-strategy-wraps-public-notice,,,, 867,"Clearwater County Lake Monitoring Program",2010,6290,,,,,,,,,,,.03,"Clearwater Soil and Water Conservation District","Local/Regional Government","This project will complete a lake data set for 303(d) and Aquatic Recreation use assessments in Clearwater County by monitoring total phosphorus, chlorophyll-a and Secchi depth; by utilizing lakeshore owners.",,,2010-04-01,2012-06-30,"Clean Water Fund",Completed,,,Kathy,Rasch,"Clearwater Soil and Water Conservation District",,,,,"(218) 694-6845",kathy.rasch@mn.nacdnet.net,Monitoring,"Minnesota Pollution Control Agency",,Clearwater,,"Clearwater River",http://www.legacy.mn.gov/projects/clearwater-county-lake-monitoring-program,,,, 23886,"Clearwater River Watershed Watershed Restoration and Protection Strategy (WRAPS) Project",2014,185473,,,,,,,,,,,1.21,"Red Lake Watershed District","Local/Regional Government","The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed. ",,"Clearwater River Watershed ",2014-03-24,2018-03-31,"Clean Water Fund",Completed,,,Corey,Hanson,"Red Lake Watershed District","1000 Pennington Avenue S. ","Thief River Falls",MN,56701,"(218) 681-5800",,"Assessment/Evaluation, Education/Outreach/Engagement, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Mahnomen, Pennington, Polk, Red Lake",,"Clearwater River",http://www.legacy.mn.gov/projects/clearwater-river-watershed-watershed-restoration-and-protection-strategy-wraps-project,,,, 23886,"Clearwater River Watershed Watershed Restoration and Protection Strategy (WRAPS) Project",2016,100000,,,,,,,,,,,.61,"Red Lake Watershed District","Local/Regional Government","The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed. ",,"Clearwater River Watershed ",2014-03-24,2018-03-31,"Clean Water Fund",Completed,,,Corey,Hanson,"Red Lake Watershed District","1000 Pennington Avenue S. ","Thief River Falls",MN,56701,"(218) 681-5800",,"Assessment/Evaluation, Education/Outreach/Engagement, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Mahnomen, Pennington, Polk, Red Lake",,"Clearwater River",http://www.legacy.mn.gov/projects/clearwater-river-watershed-watershed-restoration-and-protection-strategy-wraps-project,,,, 28128,"Clearwater Soil & Water Conservation District FY 14 Surface Water Assessment Grant (SWAG)",2014,19982,,,,,,,,,,,0.16,"Clearwater Soil and Water Conservation District","Local/Regional Government","This project will provide the assessment of the chemical, physical, biological, and bacteriological integrity of surface waters.",,"Wild Rice River Watershed Upper/Lower Red Lake Watershed Clearwater River Watershed",2014-03-24,2016-03-31,"Clean Water Fund",Completed,,,Kathy,Rasch,"Clearwater Soil and Water Conservation District","312 Main Avenue North, Suite 3 ",Bagley,MN,56621,"(218) 694-6845",,Monitoring,"Minnesota Pollution Control Agency",,Clearwater,,"Clearwater River, Upper/Lower Red Lake, Wild Rice River",http://www.legacy.mn.gov/projects/clearwater-soil-water-conservation-district-fy-14-surface-water-assessment-grant-swag,,,, 14134,"Crow Wing Watershed Lakes TMDL",2013,51477,,,,,,,,,,,.52,"Emmons & Olivier Resources (EOR)","For-Profit Business/Entity","This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.",,,2012-09-06,2013-06-28,"Clean Water Fund",Completed,,,Bonnie,Finnerty,"Minnesota Pollution Control Agency",,,,,"(218) 316-3897",bonnie.finnerty@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/crow-wing-watershed-lakes-tmdl-0,,,, 1378,"Crow Wing River Watershed Planning Project",2011,30000,,,,,,,,,,,.4,"Wadena Soil and Water Conservation District","Local/Regional Government","This project will provide Stressor ID work and assistance for the development of a work plan for the Major Watershed Project. The Major Watershed Project will include a plan for civic engagement and outreach, with assistance from ten Local Government Units from the Crow Wing River Watershed. ",,,2011-01-03,2012-01-31,"Clean Water Fund",Completed,,,Bonnie,Finnerty,,,,,,218-316-3897,bonnie.finnerty@state.mn.us,Planning,"Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/crow-wing-river-watershed-planning-project,,,, 830,"Crow Wing County Citizen Monitoring Program",2010,45964,,,,,,,,,,,.52,"Crow Wing Soil and Water Conservation District","Local/Regional Government","This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.",,,2010-03-30,2012-06-30,"Clean Water Fund",Completed,,,"Melissa ",Barrick,"Crow Wing Soil and Water Conservation District",,,,,"(218) 828-6197",melissa.barrick@co.crow-wing.mn.us,Monitoring,"Minnesota Pollution Control Agency",,"Aitkin, Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River, Mississippi River - Brainerd, Pine River",http://www.legacy.mn.gov/projects/crow-wing-county-citizen-monitoring-program,,,, 9668,"Crow Wing Watershed Lakes TMDL",2012,15041,,,,,,,,,,,.08,"Emmons & Olivier Resources ","For-Profit Business/Entity","This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project. ",,,2012-01-30,2012-06-29,"Clean Water Fund",Completed,,,Bonnie,Finnerty,"Minnesota Pollution Control Agency","520 Lafayette Road N","St. Paul",MN,55155,"(218) 316-3897",,"Analysis/Interpretation, Assessment/Evaluation, Education/Outreach/Engagement, Inventory, Planning","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/crow-wing-watershed-lakes-tmdl,,,, 2736,"Crow Wing-Major Watershed Project Phase I",2011,30000,,,,,,,,,,,.43,"Wadena Soil and Water Conservation District","Local/Regional Government","This project will initiate project coordination among project partners. It will enhance civic engagement and outreach endeavors activities to support Phase 2 of TMDL project. It will also support field activities associated with stressor ID work. ",,,2011-01-10,2012-01-31,"Clean Water Fund",Completed,,,Kari,Tomperi,"Wadena SWCD",,,,,"(218) 631-3195",kari.tomperi@mn.nacdnet.net,"Assessment/Evaluation, Planning, Preservation, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/crow-wing-major-watershed-project-phase-i,,,, 13209,"CWF-12, HSPF Watershed Modeling Phase 1, Red Lake River and Clearwater",2012,67972,,,,,,,,,,,.27,RESPEC,"For-Profit Business/Entity","This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305). ",,,2012-03-01,2012-06-30,"Clean Water Fund",Completed,,,"Michael ",Vavricka,"Minnesota Pollution Control Agency",,,,,"(218) 546-8137",michael.vavricka@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Modeling","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Mahnomen, Marshall, Pennington, Polk, Red Lake",,"Clearwater River, Red Lake River",http://www.legacy.mn.gov/projects/cwf-12-hspf-watershed-modeling-phase-1-red-lake-river-and-clearwater,,,, 13216,"CWF-12, Crow Wing River Watershed Restoration and Protection Project Phase 2",2012,69990,,,,,,,,,,,.34,"Hubbard Soil & Water Conservation District (SWCD)","Local/Regional Government","This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans. ",,,2012-10-01,2014-12-14,"Clean Water Fund",Completed,,,Melissa,Koebernick,"Hubbard Soil & Water Conservation District (SWCD)",,,,,"(218) 832-0121","Melissa.Koebernick@mn.nacdnet.net ","Analysis/Interpretation, Assessment/Evaluation, Education/Outreach/Engagement, Monitoring, Planning","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/cwf-12-crow-wing-river-watershed-restoration-and-protection-project-phase-2,,,, 13221,"CWF-12, HSPF Watershed Modeling Phase 4 for the Sauk River, Crow River",2012,49996,,,,,,,,,,,.19,RESPEC,"For-Profit Business/Entity","This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.",,,2012-05-14,2012-06-29,"Clean Water Fund",Completed,,,Chuck,Regan,"Minnesota Pollution Control Agency",,,,,"(651) 757-2866",chuck.regan@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Modeling, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Carver, Cass, Clearwater, Crow Wing, Douglas, Hennepin, Hubbard, Kandiyohi, McLeod, Meeker, Morrison, Otter Tail, Pope, Renville, Sibley, Stearns, Todd, Wadena, Wright",,"Crow Wing River, Sauk River, South Fork Crow River",http://www.legacy.mn.gov/projects/cwf-12-hspf-watershed-modeling-phase-4-sauk-river-crow-river,,,, 3352,"CWLA 11 Red Lake River Watershed Based Assessment",2011,150000,,,,,,,,,,,1.10,"Red Lake Watershed District (RLWD)","Local/Regional Government","This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired. ",,,2011-07-01,2013-06-30,"Clean Water Fund",Completed,,,"Jim ",Courneya,"Minnesota Pollution Control Agency",,,,,"(218) 846-8105",jim.courneya@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Inventory, Monitoring, Planning, Technical Assistance","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Marshall, Pennington, Polk, Red Lake",,"Red Lake River",http://www.legacy.mn.gov/projects/cwla-11-red-lake-river-watershed-based-assessment,,,, 3352,"CWLA 11 Red Lake River Watershed Based Assessment",2013,109900,,,,,,,,,,,.72,"Red Lake Watershed District (RLWD)","Local/Regional Government","This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired. ",,,2011-07-01,2013-06-30,"Clean Water Fund",Completed,,,"Jim ",Courneya,"Minnesota Pollution Control Agency",,,,,"(218) 846-8105",jim.courneya@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Inventory, Monitoring, Planning, Technical Assistance","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Marshall, Pennington, Polk, Red Lake",,"Red Lake River",http://www.legacy.mn.gov/projects/cwla-11-red-lake-river-watershed-based-assessment,,,, 10031377,"Determining Ambient Background PFAS Concentrations in Minnesota Soils",2025,621000,"M.L. 2024, Chp. 83, Sec. 2, Subd. 03g","$621,000 the second year is from the trust fund to the commissioner of the Pollution Control Agency to determine ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and nonurban soils to help Minnesota develop management strategies for PFAS-contaminated soils. This appropriation is available until June 30, 2028, by which time the project must be completed and final products delivered.","Click on 'Work Plan' under 'Project Details'.","Click on 'Work Plan' under 'Project Details'.",,,,,,,,"Minnesota Pollution Control Agency","State Government","This project determines ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and non-urban soils. This information will help Minnesota develop management strategies for PFAS contaminated soils.",,"Work Plan ",2024-07-01,2027-12-31,"Environment & Natural Resources Trust Fund","In Progress",,,"William (Bill)",Cole,"Minnesota Pollution Control Agency","520 Lafayette Road N.","St. Paul",MN,55155,"(651) 757-2788",william.cole@state.mn.us,,"Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Big Stone, Blue Earth, Brown, Carlton, Carver, Cass, Chippewa, Chisago, Clay, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Faribault, Fillmore, Freeborn, Goodhue, Grant, Hennepin, Houston, Hubbard, Isanti, Itasca, Jackson, Kanabec, Kandiyohi, Kittson, Koochiching, Lac qui Parle, Lake, Lake of the Woods, Le Sueur, Lincoln, Lyon, McLeod, Mahnomen, Marshall, Martin, Meeker, Mille Lacs, Morrison, Mower, Murray, Nicollet, Nobles, Norman, Olmsted, Otter Tail, Pennington, Pine, Pipestone, Polk, Pope, Ramsey, Red Lake, Redwood, Renville, Rice, Rock, Roseau, Scott, Sherburne, Sibley, St. Louis, Stearns, Steele, Stevens, Swift, Todd, Traverse, Wabasha, Wadena, Waseca, Washington, Watonwan, Wilkin, Winona, Wright, Yellow Medicine",,,https://www.legacy.mn.gov/projects/determining-ambient-background-pfas-concentrations-minnesota-soils,,,, 19433,"Fostering Citizen Leadership Through Workshops in Multiple Watersheds",2014,20442,,,,,,,,,,,.09,"Crow Wing Soil and Water Conservation District","Local/Regional Government","This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.",,,2013-08-09,2015-06-30,"Clean Water Fund",Completed,,,Melissa,Barrick,"Crow Wing Soil and Water Conservation District","322 Laurel Street Suite 13",Brainerd,MN,56401,218-828-6197,,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Aitkin, Becker, Beltrami, Cass, Clearwater, Crow Wing, Douglas, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River, Leech Lake River, Long Prairie River, Pine River, Redeye River",http://www.legacy.mn.gov/projects/fostering-citizen-leadership-through-workshops-multiple-watersheds,,,, 18419,"Funds Transfer for County Subsurface Sewage Treatment (SSTS) Programs",2012,600000,,,,,,,,,,,3,"Board of Water & Soil Resources","Local/Regional Government, State Government","BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County. The 48 counties awarded these funds are: Aitkin, Beltrami, Big Stone, Carlton, Carver, Cass, Chippewa, Chisago, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Hubbard, Isanti, Jackson, Kandiyohi, Koochiching, Lac Qui Parle, Lake of the Woods, Lincoln, Marshall, McLeod, Morrison, Norman, Olmsted, Pennington, Pine, Pipestone, Polk, Pope, Red Lake, Roseau, Scott, Sibley, St. Louis, Stearns, Steele, Todd, Traverse, Wadena, Waseca, Washington, Wilkin, Winona and Yellow Medicine. The amounts awarded ranged between $17,000 and $20,902 per county.",,,2011-09-11,2014-06-30,"Clean Water Fund",Completed,,,Gretchen,Sabel,"Minnesota Pollution Control Agency",,,,,"(651) 757-2686",gretchen.sabel@state.mn.us,"Assessment/Evaluation, Grants/Contracts, Preservation, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Aitkin, Beltrami, Big Stone, Carlton, Carver, Cass, Chippewa, Chisago, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Hubbard, Isanti, Jackson, Kandiyohi, Koochiching, Lac qui Parle, Lake of the Woods, Lincoln, Marshall, McLeod, Morrison, Norman, Olmsted, Pennington, Pine, Pipestone, Polk, Pope, Red Lake, Roseau, Scott, Sibley, St. Louis, Stearns, Steele, Todd, Traverse, Wadena, Waseca, Washington, Wilkin, Winona, Yellow Medicine",,Statewide,http://www.legacy.mn.gov/projects/funds-transfer-county-programs,,,, 18419,"Funds Transfer for County Subsurface Sewage Treatment (SSTS) Programs",2013,397580,,,,,,,,,,,3.98,"Board of Water & Soil Resources","Local/Regional Government, State Government","BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County. The 48 counties awarded these funds are: Aitkin, Beltrami, Big Stone, Carlton, Carver, Cass, Chippewa, Chisago, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Hubbard, Isanti, Jackson, Kandiyohi, Koochiching, Lac Qui Parle, Lake of the Woods, Lincoln, Marshall, McLeod, Morrison, Norman, Olmsted, Pennington, Pine, Pipestone, Polk, Pope, Red Lake, Roseau, Scott, Sibley, St. Louis, Stearns, Steele, Todd, Traverse, Wadena, Waseca, Washington, Wilkin, Winona and Yellow Medicine. The amounts awarded ranged between $17,000 and $20,902 per county.",,,2011-09-11,2014-06-30,"Clean Water Fund",Completed,,,Gretchen,Sabel,"Minnesota Pollution Control Agency",,,,,"(651) 757-2686",gretchen.sabel@state.mn.us,"Assessment/Evaluation, Grants/Contracts, Preservation, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Aitkin, Beltrami, Big Stone, Carlton, Carver, Cass, Chippewa, Chisago, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Hubbard, Isanti, Jackson, Kandiyohi, Koochiching, Lac qui Parle, Lake of the Woods, Lincoln, Marshall, McLeod, Morrison, Norman, Olmsted, Pennington, Pine, Pipestone, Polk, Pope, Red Lake, Roseau, Scott, Sibley, St. Louis, Stearns, Steele, Todd, Traverse, Wadena, Waseca, Washington, Wilkin, Winona, Yellow Medicine",,Statewide,http://www.legacy.mn.gov/projects/funds-transfer-county-programs,,,, 14141,"FY-13, HSPF Red Lake River and Clear River Watersheds",2013,99986,,,,,,,,,,,.42,RESPEC,"For-Profit Business/Entity","This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. ",,,2012-10-03,2013-06-28,"Clean Water Fund",Completed,,,Mike,Vavricka,"Minnesota Pollution Control Agency",,,,,"(218) 846-8137",michael.vavricka@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Modeling, Technical Assistance","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Mahnomen, Marshall, Pennington, Polk, Red Lake",,"Clearwater River, Red Lake River",http://www.legacy.mn.gov/projects/fy-13-hspf-red-lake-river-and-clear-river-watersheds,,,, 18524,"FY-13, Crow Wing River Watershed - Stream TMDLs",2013,77773,,,,,,,,,,,.33,"Emmons & Olivier Resources","For-Profit Business/Entity","The goal of this project is to develop a TMDL for all impaired stream reaches within the Crow Wing Watershed and for Eighth Crow Wing Lake. ",,,2013-03-01,2014-06-30,"Clean Water Fund",Completed,,,"Bonnie ","Finnerty ",MPCA,,,,,218-316-3897,"bonnie.finnerty@state.mn.us ","Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/fy-13-crow-wing-river-watershed-stream-tmdls,,,, 18870,"FY-13, Crow Wing River WRAP - TMDLs",2013,31328,,,,,,,,,,,.16,"Emmons & Olivier Resources (EOR)","Non-Profit Business/Entity","The Crow Wing River Watershed consists of approximately 1,959 square miles in the north to north central portion of the Upper Mississippi River Basin in Central Minnesota. The watershed encompasses all or parts of Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd and Wadena Counties. The dominant land use within the watershed is forested (41%), agriculture (32%), grass, shrub and wetland make up 17%, water (7%) and urban (3%). The majority of the watershed is within the Northern Lakes and Forests Ecoregion with a small portion in the North Central Hardwood Forest. ",,,2013-06-28,2014-06-30,"Clean Water Fund",Completed,,,Pat,Conrad,"Emmons & Olivier Resources","651 Hale Avenue North",Oakdale,MN,55128,"(651) 770-8448",pconrad@eorinc.com,"Monitoring, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/fy-13-crow-wing-river-wrap-tmdls,,,, 29027,"FY14 SWAG - Red Lake DNR",2014,84959,,,,,,,,,,,.47,"Red Lake Department of Natural Resources","Federal Government","The stream monitoring will follow the stream monitoring parameters and frequency tables outlined in the Surface Water Assessment Grant (SWAG) Request for Proposals (RFP). Specifically over the two-year grant period, monitoring will include 19 sets of field measurements for specific conductance, temperature, pH, dissolved oxygen, secchi tube readings, and one upstream photograph at each visit. In 2014, all 18 sites will be sampled bi-monthly May-September for total suspended volatile solids, total suspended solids, total phosphorus, ammonia-nitrogen, total Kjeldahl nitrogen, nitrate-nitrogen, sulfate, chloride, and hardness as CaCO3. From June-August, E. coli will be sampled three times per month. Two of the eighteen sites will also be monitored following the river nutrient sampling regime and in 2014 will require sampling for chlorophyll a, corrected for pheophytin, twice monthly from June-August and once in September. A QA/QC field replicate sample will be collected at all sites the last round of July. In 2015, the 18 sites will be sampled for E. coli bi-monthly from June-August. The two river nutrient sampling sites will also be sampled for total phosphorus, total Kjeldahl nitrogen, nitrate-nitrogen, and chlorophyll a, corrected for pheophytin, bi-monthly from June-August.",,"Upper/Lower Red Lake Watershed",2014-05-01,2016-03-31,"Clean Water Fund",Completed,,,Kayla,Bowe,"Red Lake Department of Natural Resources","1576 High School Drive ","Red Lake",MN,56671,"(218) 679-1607",,Monitoring,"Minnesota Pollution Control Agency",,"Red Lake",,"Upper/Lower Red Lake",http://www.legacy.mn.gov/node/29027,,,, 10031416,"Get the Lead Out: Lead-Free Fishing Tackle Education",2025,254000,"M.L. 2024, Chp. 83, Sec. 2, Subd. 05e","$254,000 the second year is from the trust fund to the commissioner of the Pollution Control Agency to protect common loons and wildlife through education and outreach about the dangers of lead fishing tackle and promoting lead-free tackle alternatives.","Click on 'Work Plan' under 'Project Details'.","Click on 'Work Plan' under 'Project Details'.",,,,,,,0.3,"Minnesota Pollution Control Agency","State Government","Get the Lead Out is focused on protecting common loons and wildlife through education and outreach about the danger of lead fishing tackle and promoting lead-free tackle alternatives.",,"Work Plan ",2024-07-01,2026-06-30,"Environment & Natural Resources Trust Fund","In Progress",,,Kelly,Amoth,"Minnesota Pollution Control Agency","520 Lafayette Rd","St. Paul",MN,55155,"(651) 757-2344",kelly.amoth@state.mn.us,,"Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Big Stone, Blue Earth, Brown, Carlton, Carver, Cass, Chippewa, Chisago, Clay, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Faribault, Fillmore, Freeborn, Goodhue, Grant, Hennepin, Houston, Hubbard, Isanti, Itasca, Jackson, Kanabec, Kandiyohi, Kittson, Koochiching, Lac qui Parle, Lake, Lake of the Woods, Le Sueur, Lincoln, Lyon, McLeod, Mahnomen, Marshall, Martin, Meeker, Mille Lacs, Morrison, Mower, Murray, Nicollet, Nobles, Norman, Olmsted, Otter Tail, Pennington, Pine, Pipestone, Polk, Pope, Ramsey, Red Lake, Redwood, Renville, Rice, Rock, Roseau, Scott, Sherburne, Sibley, St. Louis, Stearns, Steele, Stevens, Swift, Todd, Traverse, Wabasha, Wadena, Waseca, Washington, Watonwan, Wilkin, Winona, Wright, Yellow Medicine",,,https://www.legacy.mn.gov/projects/get-lead-out-lead-free-fishing-tackle-education,,,, 1341,"HSPF Model Framework Development for the Crow Wing, Redeye, and Long Prairie Rivers Watersheds",2011,99950,,,,,,,,,,,.40,"AQUA TERRA Consultants","For-Profit Business/Entity","This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.",,,2011-01-21,2011-06-30,"Clean Water Fund",Completed,,,Charles,Regan,"Minnesota Pollution Control Agency",,,,,651-757-2866,chuck.regan@state.mn.us,Analysis/Interpretation,"Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Douglas, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River, Long Prairie River, Redeye River",http://www.legacy.mn.gov/projects/hspf-model-framework-development-crow-wing-redeye-and-long-prairie-rivers-watersheds,,,, 14126,"HSPF Phases1-2: Mississippi Headwaters, Leech Lake, and Pine River",2013,174954,,,,,,,,,,,.80,RESPEC,"For-Profit Business/Entity","This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.",,,2012-07-02,2013-06-28,"Clean Water Fund",Completed,,,Charles,Regan,"Minnesota Pollution Control Agency",,,,,651-757-2866,chuck.regan@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Modeling","Minnesota Pollution Control Agency",,"Aitkin, Becker, Beltrami, Cass, Clearwater, Crow Wing, Hubbard, Itasca",,"Leech Lake River, Mississippi River - Headwaters, Pine River",http://www.legacy.mn.gov/projects/hspf-phases1-2-mississippi-headwaters-leech-lake-and-pine-river,,,, 19432,"HSPF Modeling Phase 3: Upper Mississippi River Basin",2014,396300,,,,,,,,,,,1.81,RESPEC,"For-Profit Business/Entity","The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.",,,2013-07-18,2015-05-31,"Clean Water Fund",Completed,,,"Charles ",Regan,MPCA,"St. Paul Office",,,,651/757-2866,,"Modeling, Technical Assistance","Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Carlton, Cass, Clearwater, Crow Wing, Hubbard, Isanti, Itasca, Kanabec, Meeker, Mille Lacs, Morrison, Sherburne, St. Louis, Stearns, Todd, Wright",,"Leech Lake River, Mississippi River - Brainerd, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mississippi River - Sartell, Mississippi River - St. Cloud, Pine River, Rum River",http://www.legacy.mn.gov/projects/hspf-modeling-phase-3-upper-mississippi-river-basin,,,, 23536,"HSPF Modeling- Red Lake River and Tributaries",2014,95000,,,,,,,,,,,0.40,RESPEC,"For-Profit Business/Entity","The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.",,,2013-08-19,2014-06-30,"Clean Water Fund",Completed,,,"Michael M",Vavricka,MPCA,"714 Lake Ave.","Detroit Lakes",MN,56501,218-846-8137,,Modeling,"Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Marshall, Pennington, Polk, Red Lake",,"Red Lake River",http://www.legacy.mn.gov/projects/hspf-modeling-red-lake-river-and-tributaries,,,, 13217,"Hydrologic Simulation Program FORTRAN (HSPF) Watershed Modeling Phase 2 & Phase 3 for the Crow Wing, Redeye, and Long Prairie Rivers Watersheds",2012,120238,,,,,,,,,,,.44,"Aqua Terra Consultants","For-Profit Business/Entity","This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.",,,2011-09-22,2013-09-30,"Clean Water Fund",Completed,,,Charles,Regan,"Minnesota Pollution Control Agency",,,,,"(651) 757-2866",chuck.regan@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Modeling, Planning","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Douglas, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River, Long Prairie River, Redeye River",http://www.legacy.mn.gov/projects/hydrologic-simulation-program-fortran-hspf-watershed-modeling-phase-2-phase-3-crow-wing-red,,,, 13217,"Hydrologic Simulation Program FORTRAN (HSPF) Watershed Modeling Phase 2 & Phase 3 for the Crow Wing, Redeye, and Long Prairie Rivers Watersheds",2013,134980,,,,,,,,,,,.44,"Aqua Terra Consultants","For-Profit Business/Entity","This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.",,,2011-09-22,2013-09-30,"Clean Water Fund",Completed,,,Charles,Regan,"Minnesota Pollution Control Agency",,,,,"(651) 757-2866",chuck.regan@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Modeling, Planning","Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Douglas, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River, Long Prairie River, Redeye River",http://www.legacy.mn.gov/projects/hydrologic-simulation-program-fortran-hspf-watershed-modeling-phase-2-phase-3-crow-wing-red,,,, 9760,"Major Waterhsed Load Monitoring",2012,134867,,,,,,,,,,,.64,"International Water Institute","Non-Profit Business/Entity","This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs. ",,,2012-04-04,2014-01-31,"Clean Water Fund",Completed,,,Danni,Halvorson,"International Water Institute",,,,,"(218) 280-0515",dannihalvorson@iwinst.org,"Analysis/Interpretation, Assessment/Evaluation, Monitoring","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Kittson, Mahnomen, Marshall, Norman, Pennington, Polk, Red Lake, Roseau",,"Clearwater River, Red River of the North - Grand Marais Creek, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Two Rivers",http://www.legacy.mn.gov/projects/major-waterhsed-load-monitoring,,,, 10012185,"Minnesota River Stakeholder Process",2020,8000,,,,,,,,,,,.08,"Mankato State University","State Government","Mankato State University (MSU) will work with the Minnesota Pollution Control Agency (MPCA) and the Minnesota Department of Agriculture (MDA) to plan a stakeholder process kick off meeting for the Minnesota River Ag/Urban partnership project. MSU will help to plan and facilitate the meeting. ",,"Ag-urban partnership to help the Minnesota River ",2019-09-23,2020-06-30,"Clean Water Fund",Completed,,,Paul,Davis,"Mankato State University","12 Civic Center Plz Ste 2165",Mankato,MN,56001,"(507) 344-5246",,"Technical Assistance","Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Carlton, Carver, Cass, Chisago, Clearwater, Crow Wing, Dakota, Douglas, Hennepin, Hubbard, Isanti, Itasca, Kanabec, Kandiyohi, McLeod, Meeker, Mille Lacs, Morrison, Otter Tail, Pope, Ramsey, Renville, Sherburne, Sibley, St. Louis, Stearns, Todd, Wadena, Washington, Wright",,"Blue Earth River, Chippewa River, Cottonwood River, Lac qui Parle River, Le Sueur River, Lower Minnesota River , Minnesota River - Headwaters, Minnesota River - Mankato, Minnesota River - Yellow Medicine River, Pomme de Terre River, Redwood River, Watonwan River",https://www.legacy.mn.gov/projects/minnesota-river-stakeholder-process,,,, 14129,"Mississippi River (Headwaters) Watershed – Restoration and Protection Project (Phase I)",2013,30000,,,,,,,,,,,.35,"Beltrami County Environmental Services (BCES)","Local/Regional Government","This Phase 1 project will support project planning, coordination and civic engagement/outreach components of the Mississippi River (Headwaters) Major Watershed project. Phase 1 of this project will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data. ",,,2012-09-24,2014-02-28,"Clean Water Fund",Completed,,,William,Patnaude,"Beltrami County Environmental Services (BCES)",,,,,"(218) 333-4158",william.patnaude@co.beltrami.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Planning, Preservation, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Becker, Beltrami, Cass, Clearwater, Hubbard, Itasca",,"Mississippi River - Headwaters",http://www.legacy.mn.gov/projects/mississippi-river-headwaters-watershed-restoration-and-protection-project-phase-i,,,, 18842,"Mississippi River Headwaters Surface Water Assessment Grant 2013",2013,64701,,,,,,,,,,,.26,"Itasca County Soil and Water Conservation District","Local/Regional Government","The goal of this project is complete a dataset necessary for assessment of 6 stream sites and 11 lakes within the Mississippi Headwaters Watershed to determine the overall health of its water resources, to identify impaired waters, and to identify those waters in need of additional protection to prevent future impairments. ",,"Surface Water Assessment Grants ",2013-05-07,2015-06-30,"Clean Water Fund",Completed,,,Noel,Griese,"Itasca County Soil and Water Conservation District","1889 East Highway 2","Grand Rapids",MN,55744,218-326-0017,noel.griese@itascaswcd.org,"Assessment/Evaluation, Monitoring, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Beltrami, Cass, Clearwater, Hubbard, Itasca",,"Mississippi River - Headwaters",http://www.legacy.mn.gov/projects/mississippi-river-headwaters-surface-water-assessment-grant-2013,,,, 37408,"Mississippi River - Headwaters Watershed Restoration and Protection Strategy (WRAPS) - Phase 2",2017,48350,,,,,,,,,,,0.61,"Hubbard County SWCD","Local/Regional Government","Several important milestones will be completed during this phase of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report. Currently, this watershed has few listed conventional impairments; however, it is possible that additional impairments may have been identified during the Intensive Watershed Monitoring and subsequent watershed assessment process. This project will significantly contribute to establishing the foundation for long-term public participation in surface water protection and restoration activities throughout the watershed. ",,"Mississippi River - Headwaters Watershed ",2015-01-16,2017-12-31,"Clean Water Fund",Completed,,,Julie,Kingsley,"Hubbard County SWCD","212 1/2 2nd St ","W Park Rapids",MN,56470,"(218) 732-0121",,"Education/Outreach/Engagement, Planning, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Becker, Beltrami, Cass, Clearwater, Hubbard, Itasca",,"Mississippi River - Headwaters",http://www.legacy.mn.gov/projects/mississippi-river-headwaters-watershed-restoration-and-protection-strategy-wraps-phase-2,,,, 28138,"Mississippi River - Headwaters Watershed Restoration and Protection Strategy (WRAPS)",2015,120000,,,,,,,,,,,.61,"Hubbard County Soil and Water Conservation District","Local/Regional Government","Several important milestones will be completed during this Phase (Phase II) of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report. Currently, this watershed has few listed conventional impairments; however, it is possible that additional impairments may have been identified during the Intensive Watershed Monitoring and subsequent watershed assessment process. The objectives and tasks described in this workplan will be primarily geared towards working with the stakeholders on strategies aimed to protect the surface water resources within this high quality watershed. Phase II of the project will also continue the effort in providing the important water quality framework and stakeholder activities for civic/citizen engagement and communication. This in turn will significantly contribute to establishing the foundation for long-term public participation in surface water protection and restoration activities throughout the watershed. ",,"Minnesota River - Headwaters Watershed ",2015-01-16,2017-06-30,"Clean Water Fund",Completed,,,Julie,Kingsley,"Hubbard County Soil and Water Conservation District","212 1/2 2nd Street West ","Park Rapids",MN,56470,"(218) 732-0121",,"Education/Outreach/Engagement, Planning, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Becker, Beltrami, Cass, Clearwater, Hubbard, Itasca",,"Minnesota River - Headwaters",http://www.legacy.mn.gov/projects/mississippi-river-headwaters-watershed-restoration-and-protection-strategy-wraps,,,, 28138,"Mississippi River - Headwaters Watershed Restoration and Protection Strategy (WRAPS)",2017,48349,,,,,,,,,,,32,"Hubbard County Soil and Water Conservation District","Local/Regional Government","Several important milestones will be completed during this Phase (Phase II) of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report. Currently, this watershed has few listed conventional impairments; however, it is possible that additional impairments may have been identified during the Intensive Watershed Monitoring and subsequent watershed assessment process. The objectives and tasks described in this workplan will be primarily geared towards working with the stakeholders on strategies aimed to protect the surface water resources within this high quality watershed. Phase II of the project will also continue the effort in providing the important water quality framework and stakeholder activities for civic/citizen engagement and communication. This in turn will significantly contribute to establishing the foundation for long-term public participation in surface water protection and restoration activities throughout the watershed. ",,"Minnesota River - Headwaters Watershed ",2015-01-16,2017-06-30,"Clean Water Fund",Completed,,,Julie,Kingsley,"Hubbard County Soil and Water Conservation District","212 1/2 2nd Street West ","Park Rapids",MN,56470,"(218) 732-0121",,"Education/Outreach/Engagement, Planning, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Becker, Beltrami, Cass, Clearwater, Hubbard, Itasca",,"Minnesota River - Headwaters",http://www.legacy.mn.gov/projects/mississippi-river-headwaters-watershed-restoration-and-protection-strategy-wraps,,,, 1116,"MPCA Water Monitoring Section Activities 2010",2010,4432804,,,,,,,,,,,,"Minnesota Pollution Control Agency","State Government","This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed. Monitoring includes biological (fish and invertebrates), chemical (nutirents, sediments, etc.) and physical (habitiat) measurements. Major watershed load monitoring (Watershed-Statewide): The major watershed load monitoring effort provides data on water quality conditions and trends for Minnesota's major rivers and their main tributaries. Ambient wetland monitoring: The goals of the ambient wetland monitoring effort are to assess status and trends of wetland conditions.",,,2009-07-01,2010-06-30,"Clean Water Fund",Completed,,,Glenn,Skuta,"Minnesota Pollution Control Agency","520 Lafayette Rd. N. ","St. Paul",MN,55155,651-757-2730,glenn.skuta@state.mn.us,Monitoring,"Minnesota Pollution Control Agency",,"Anoka, Becker, Beltrami, Big Stone, Carver, Cass, Chippewa, Clearwater, Crow Wing, Dakota, Grant, Hennepin, Hubbard, Itasca, Kandiyohi, Koochiching, Lac qui Parle, Lincoln, Lyon, Morrison, Olmsted, Otter Tail, Ramsey, Redwood, Renville, Sherburne, Stevens, Todd, Traverse, Wabasha, Wadena, Washington, Wilkin, Wright, Yellow Medicine",,"Big Fork River, Bois de Sioux River, Crow Wing River, Minnesota River - Yellow Medicine River, Mississippi River - Twin Cities, Mississippi River - Winona, Mustinka River",http://www.legacy.mn.gov/projects/mpca-water-monitoring-section-activities-2010,,,, 9761,"MPCA Water Monitoring Section Activities 2012",2012,5500000,,,,,,,,,,,39.8,"Minnesota Pollution Control Agency","State Government","This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed. Monitoring includes biological (fish and invertebrates), chemical (nutrients, sediments, etc.) and physical (habitat) measurements. Watershed Pollutant Load Monitoring Network: (Watershed-Statewide): The watershed pollutant load monitoring effort provides data on water quality conditions and trends for Minnesota's major rivers and their main tributaries. Ambient wetland monitoring: The goals of the ambient wetland monitoring effort are to assess status and trends of wetland conditions.",,,2011-07-01,2012-06-30,"Clean Water Fund",Completed,,,Glenn,Skuta,"Minnesota Pollution Control Agency",,,,,"(651) 757-2730",glenn.skuta@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Monitoring, Planning","Minnesota Pollution Control Agency",,"Aitkin, Beltrami, Carver, Cass, Clearwater, Crow Wing, Dodge, Goodhue, Hennepin, Hubbard, Kandiyohi, Lake of the Woods, Marshall, McLeod, Meeker, Mower, Olmsted, Pennington, Polk, Red Lake, Renville, Rice, Roseau, Sibley, Steele, Wabasha, Wright",,"Lake of the Woods, Leech Lake River, Pine River, Red Lake River, Red River of the North - Grand Marais Creek, South Fork Crow River, Zumbro River",http://www.legacy.mn.gov/projects/mpca-water-monitoring-section-activities-2012,,,, 23545,"MPCA Water Monitoring Section Activities 2014",2014,3284104,,,,,,,,,,,24.13,"Minnesota Pollution Control Agency","State Government","This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed. Monitoring includes biological (fish and invertebrates), chemical (nutrients, sediments, etc.) and physical (habitat) measurements. Watershed Pollutant Load Monitoring Network: (Watershed-Statewide): The watershed pollutant load monitoring effort provides data on water quality conditions and trends for Minnesota's major rivers and their main tributaries. Ambient wetland monitoring: The goals of the ambient wetland monitoring effort are to assess status and trends of wetland conditions.",,,2013-07-01,2014-06-30,"Clean Water Fund",Completed,,,Pam,Anderson,MPCA,"520 Lafayette Road North ","St. Paul",MN,55155,651-757-2190,pamela.anderson@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Monitoring","Minnesota Pollution Control Agency",,"Aitkin, Becker, Beltrami, Benton, Big Stone, Carlton, Carver, Cass, Chippewa, Chisago, Clay, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Faribault, Fillmore, Freeborn, Hennepin, Houston, Itasca, Jackson, Kittson, Koochiching",,Statewide,http://www.legacy.mn.gov/projects/mpca-water-monitoring-section-activities-2014,,,, 23875,"MPCA Ambient Groundwater Monitoring Activities 2014",2014,297169,,,,,,,,,,,2.15,"Minnesota Pollution Control Agency","State Government","This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.",,,2013-07-01,2015-06-30,"Clean Water Fund",Completed,,,Sharon,Kroening,MPCA,"520 Lafayette Road North ","St. Paul",MN,55155,"(651) 757-2507",sharon.kroening@state.mn.us,"Analysis/Interpretation, Monitoring, Planning","Minnesota Pollution Control Agency",,"Anoka, Becker, Beltrami, Blue Earth, Carlton, Cass, Chisago, Clay, Clearwater, Dakota, Faribault, Goodhue, Hennepin, Hubbard, Itasca, Lake, Lake of the Woods, Lyon, Morrison, Mower, Olmsted, Otter Tail, Pine, Polk, Ramsey, Redwood, Scott, Sherburne, Stearns, Todd, Wabasha, Wadena, Washington, Winona",,"Blue Earth River, Buffalo River, Cedar River, Clearwater River, Cottonwood River, Crow Wing River, Kettle River, Le Sueur River, Leech Lake River, Long Prairie River, Lower Minnesota River , Lower St. Croix River, Mississippi River - Brainerd, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mississippi River - Lake Pepin, Mississippi River - Sartell, Mississippi River - St. Cloud, Mississippi River - Twin Cities, Mississippi River - Winona, Nemadji River, North Fork Crow River, Otter Tail River, Pine River, Rainy River - Headwaters, Redeye River, Redwood River, Roseau River, Rum River, Sauk River, St. Louis River, Upper Red River of the North, Zumbro River",http://www.legacy.mn.gov/projects/mpca-ambient-groundwater-monitoring-activities-2014,,,, 23885,"MPCA Ambient Groundwater Monitoring Activities 2015",2015,287628,,,,,,,,,,,3.05,"Minnesota Pollution Control Agency","State Government","This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.",,,2013-07-01,2015-06-30,"Clean Water Fund",Completed,,,Sharon,Kroening,MPCA,"520 Lafayette Road North ","St. Paul",MN,55155,(651)757-2507,sharon.kroening@state.mn.us,"Analysis/Interpretation, Monitoring, Planning","Minnesota Pollution Control Agency",,"Anoka, Becker, Beltrami, Blue Earth, Carlton, Cass, Chisago, Clay, Clearwater, Dakota, Faribault, Goodhue, Hennepin, Hubbard, Itasca, Lake, Lake of the Woods, Lyon, Morrison, Mower, Olmsted, Otter Tail, Pine, Polk, Ramsey, Redwood, Scott, Sherburne, Stearns, Todd, Wabasha, Wadena, Washington, Winona",,"Blue Earth River, Buffalo River, Cedar River, Clearwater River, Cottonwood River, Crow Wing River, Kettle River, Le Sueur River, Leech Lake River, Long Prairie River, Lower Minnesota River , Lower St. Croix River, Mississippi River - Brainerd, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mississippi River - Lake Pepin, Mississippi River - Sartell, Mississippi River - St. Cloud, Mississippi River - Twin Cities, Mississippi River - Winona, Nemadji River, North Fork Crow River, Otter Tail River, Pine River, Rainy River - Headwaters, Redeye River, Redwood River, Roseau River, Rum River, Sauk River, St. Louis River, Upper Red River of the North, Zumbro River",http://www.legacy.mn.gov/projects/mpca-ambient-groundwater-monitoring-activities-2015,,,, 27365,"MPCA Water Monitoring Section Activities 2015",2015,3650679,,,,,,,,,,,27.64,"Minnesota Pollution Control Agency","State Government","This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed. Monitoring includes biological (fish and invertebrates), chemical (nutrients, sediments, etc.) and physical (habitat) measurements. Watershed Pollutant Load Monitoring Network: (Watershed-Statewide): The watershed pollutant load monitoring effort provides data on water quality conditions and trends for Minnesota's major rivers and their main tributaries. Ambient wetland monitoring: The goals of the ambient wetland monitoring effort are to assess status and trends of wetland conditions.",,,2014-07-01,2015-06-30,"Clean Water Fund",Completed,,,Pam,Anderson,MPCA,"520 Lafayette Road North ","St. Paul",MN,55155,651-757-2190,pamela.anderson@state.mn.us,"Analysis/Interpretation, Assessment/Evaluation, Monitoring","Minnesota Pollution Control Agency",,"Aitkin, Becker, Beltrami, Benton, Big Stone, Carlton, Carver, Cass, Chippewa, Chisago, Clay, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Faribault, Fillmore, Freeborn, Hennepin, Houston, Itasca, Jackson, Kittson, Koochiching",,Statewide,http://www.legacy.mn.gov/projects/mpca-water-monitoring-section-activities-2015,,,, 19440,"Multi-Agency Watershed Database Reporting Portal",2014,1000000,,,,,,,,,,,10,"Minnesota Pollution Control Agency","State Government","The goal of this project is to analyze and document database architecture, platform, table structures, systems and data fields at six Minnesota agencies (Board of Soil and Water Resources, Department of Natural Resources, MN Department of Agriculture, MN Department of Health, Metropolitan Council, and MN Pollution Control Agency) for 30+ databases related to water.",,,2013-07-01,2015-06-30,"Clean Water Fund",Completed,,,"Gaylen ",Reetz,MPCA,"520 Lafayette Road North","St. Paul",MN,55155,651-757-2664,,"Digitization/Online Information Access, Technical Assistance","Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Big Stone, Blue Earth, Brown, Carlton, Carver, Cass, Chippewa, Chisago, Clay, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Faribault, Fillmore, Freeborn, Goodhue, Grant, Hennepin, Houston, Hubbard, Isanti, Itasca, Jackson, Kanabec, Kandiyohi, Kittson, Koochiching, Lac qui Parle, Lake, Lake of the Woods, Le Sueur, Lincoln, Lyon, Mahnomen, Marshall, Martin, McLeod, Meeker, Mille Lacs, Morrison, Mower, Murray, Nicollet, Nobles, Norman, Olmsted, Otter Tail, Pennington, Pine, Pipestone, Polk, Pope, Ramsey, Red Lake, Redwood, Renville, Rice, Rock, Roseau, Scott, Sherburne, Sibley, St. Louis, Statewide, Stearns, Steele, Stevens, Swift, Todd, Traverse, Wabasha, Wadena, Waseca, Washington, Watonwan, Wilkin, Winona, Wright, Yellow Medicine",,Statewide,http://www.legacy.mn.gov/projects/multi-agency-watershed-database-reporting-portal,,,, 19440,"Multi-Agency Watershed Database Reporting Portal",2015,1000000,,,,,,,,,,,10,"Minnesota Pollution Control Agency","State Government","The goal of this project is to analyze and document database architecture, platform, table structures, systems and data fields at six Minnesota agencies (Board of Soil and Water Resources, Department of Natural Resources, MN Department of Agriculture, MN Department of Health, Metropolitan Council, and MN Pollution Control Agency) for 30+ databases related to water.",,,2013-07-01,2015-06-30,"Clean Water Fund",Completed,,,"Gaylen ",Reetz,MPCA,"520 Lafayette Road North","St. Paul",MN,55155,651-757-2664,,"Digitization/Online Information Access, Technical Assistance","Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Big Stone, Blue Earth, Brown, Carlton, Carver, Cass, Chippewa, Chisago, Clay, Clearwater, Cook, Cottonwood, Crow Wing, Dakota, Dodge, Douglas, Faribault, Fillmore, Freeborn, Goodhue, Grant, Hennepin, Houston, Hubbard, Isanti, Itasca, Jackson, Kanabec, Kandiyohi, Kittson, Koochiching, Lac qui Parle, Lake, Lake of the Woods, Le Sueur, Lincoln, Lyon, Mahnomen, Marshall, Martin, McLeod, Meeker, Mille Lacs, Morrison, Mower, Murray, Nicollet, Nobles, Norman, Olmsted, Otter Tail, Pennington, Pine, Pipestone, Polk, Pope, Ramsey, Red Lake, Redwood, Renville, Rice, Rock, Roseau, Scott, Sherburne, Sibley, St. Louis, Statewide, Stearns, Steele, Stevens, Swift, Todd, Traverse, Wabasha, Wadena, Waseca, Washington, Watonwan, Wilkin, Winona, Wright, Yellow Medicine",,Statewide,http://www.legacy.mn.gov/projects/multi-agency-watershed-database-reporting-portal,,,, 10008246,"Otter Tail River Watershed Restoration and Protection Strategy (WRAPS) - Phase 2",2019,164879,,,,,,,,,,,.65,"East Otter Tail SWCD","Local/Regional Government","The goals of project are to: 1) engage stakeholders and the public in watershed management activities; 2) conduct microbial source tracking to determine the source(s) of E. coli in E.coli-impaired streams; 3) develop Total Maximum Daily Loads (TMDLs) for impaired lakes and streams requiring TMDL development; 4) develop the Otter Tail River Watershed Restoration and Protection Strategy (WRAPS) report, which identifies restoration and protection strategies for lakes and streams through various analyses; and 5) conduct project management and communication activities necessary to ensure project success. Stakeholder involvement and public participation will be a focus throughout the project. The project provides an opportunity to assess and leverage the capacity of the local community to engage in watershed management and to adopt protection and restoration practices. ",,"Otter Tail River Watershed ",2019-04-17,2021-06-30,"Clean Water Fund",Completed,,,Darren,Newville,"East Otter Tail SWCD","655 3rd Ave SE",Perham,MN,56573,"(218) 346-4260",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Clay, Clearwater, Mahnomen, Otter Tail, Wilkin",,"Otter Tail River",https://www.legacy.mn.gov/projects/otter-tail-river-watershed-restoration-and-protection-strategy-wraps-phase-2,,,, 37669,"Otter Tail River Watershed Restoration and Protection Strategy (WRAPS) - Phase 1",2017,52556,,,,,,,,,,,0.36,"East Otter Tail SWCD","Local/Regional Government","This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report. ",,"Otter Tail River Watershed ",2017-06-15,2018-09-30,"Clean Water Fund",Completed,,,Darren,Newville,"District Manager","801 Jenny Ave SW, Ste 2",Perham,MN,56573,"(218) 346-4260",,"Analysis/Interpretation, Assessment/Evaluation, Education/Outreach/Engagement, Planning","Minnesota Pollution Control Agency",,"Becker, Clearwater, Otter Tail, Wilkin",,"Otter Tail River",http://www.legacy.mn.gov/projects/otter-tail-river-watershed-restoration-and-protection-strategy-wraps-phase-1,,,, 37413,"Otter Tail Watershed Modeling - Phase 2",2017,75000,,,,,,,,,,,0.29,"Tetra Tech Inc","For-Profit Business/Entity","The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.",,"Otter Tail River Watershed ",2016-09-02,2017-06-30,"Clean Water Fund",Completed,,,Michael,Vavricka,MPCA,"714 Lake Ave Ste 220","Detroit Lakes",MN,56501,"(218) 846-8137",,Modeling,"Minnesota Pollution Control Agency",,"Becker, Clay, Clearwater, Mahnomen, Otter Tail, Wilkin",,"Otter Tail River",http://www.legacy.mn.gov/projects/otter-tail-watershed-modeling-phase-2,,,, 33247,"OtterTail Civic Engagement Cohort Training",2015,80322,,,,,,,,,,,.28,"University of Minnesota: Sponsored Projects Administration","Public College/University","This project will be the first of its kind Civic Engagement Cohort that focusses its efforts in an individual watershed. The Otter Tail River Watershed is scheduled to start a Watershed Restoration and Protection Strategy (WRAPS) in 2016 and as a component of that project, the cohort will provide the civic engagement requirement. The cohort will be comprised of 25-30 individuals located throughout the watershed who represent a broad spectrum of resource managers and citizens who are familiar with water quality and watershed management. The cohort will provide educational material, capacity building, and principles of civic engagement.",,"Otter Tail River Watershed ",2015-03-01,2017-12-30,"Clean Water Fund",Completed,,,Kent,Olson,"University of Minnesota: Sponsored Projects Administration","450 McNamara Center, 200 Oak Street Southeast",Minneapolis,MN,55455,"(612) 626-7441",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Clay, Clearwater, Mahnomen, Otter Tail, Wilkin",,"Otter Tail River",http://www.legacy.mn.gov/projects/ottertail-civic-engagement-cohort-training,,,, 33252,"Ottertail River Watershed Hydrologic Simulation Program FORTRAN (HSPF) Modeling - Phase 1",2016,80000,,,,,,,,,,,0.32,"Tetra Tech","For-Profit Business/Entity","The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data. The contractor will deliver all modeling files, memorandums, and a final report documenting model calibration and validation and supporting statistics. ",,"Otter Tail River Watershed",2015-10-13,2016-06-30,"Clean Water Fund",Completed,,,"Michael M",Vavricka,"MPCA Detroit Lakes Office","714 Lake Street, Suite 220","Detroit Lakes",MN,56501,"(218) 846-8137",,Modeling,"Minnesota Pollution Control Agency",,"Becker, Clay, Clearwater, Mahnomen, Otter Tail, Wilkin",,"Otter Tail River",http://www.legacy.mn.gov/projects/ottertail-river-watershed-hydrologic-simulation-program-fortran-hspf-modeling-phase-1,,,, 29497,"Phosphorous Study in the Red River Basin",2015,18375,,,,,,,,,,,.18,"United States Geological Survey (USGS)","Federal Government","The study will assess existing phosphorus data records and create a model to explain phosphorus loading into the Red River of the North. Studies have found that the majority of nutrient loading in the stream located in agricultural areas occurs with sediment loading since nutrients are typically bound to sediment particles.",,,2015-01-26,2015-09-30,"Clean Water Fund",Completed,,,Joel,Galloway,"United States Geological Survey","2280 Woodale Drive","Mounds View",MN,55112,(763)783-3120,,Modeling,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,Statewide,http://www.legacy.mn.gov/projects/phosphorous-study-red-river-basin,,,, 18286,"Real-time Water Quality Monitoring-Red River of the North at Fargo and Grand Foks, ND 2012 & 2013",2012,10800,,,,,,60800,"USGS & Regional Partners",,,,.20,"United States Geological Survey (USGS)","Federal Government","This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report. ",,,2012-05-14,2013-09-30,"Clean Water Fund",Completed,,,Cary,Hernandez,"Minnesota Pollution Control Agency",,,,,"(218) 846-8124",,"Analysis/Interpretation, Assessment/Evaluation, Monitoring","Minnesota Pollution Control Agency",,"Beltrami, Clay, Clearwater, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Wilkin",,"Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Sandhill River, Upper Red River of the North",http://www.legacy.mn.gov/projects/real-time-water-quality-monitoring-red-river-north-fargo-and-grand-foks-nd-2012-2013,,,, 18286,"Real-time Water Quality Monitoring-Red River of the North at Fargo and Grand Foks, ND 2012 & 2013",2013,11119,,,,,,,,,,,.20,"United States Geological Survey (USGS)","Federal Government","This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report. ",,,2012-05-14,2013-09-30,"Clean Water Fund",Completed,,,Cary,Hernandez,"Minnesota Pollution Control Agency",,,,,"(218) 846-8124",,"Analysis/Interpretation, Assessment/Evaluation, Monitoring","Minnesota Pollution Control Agency",,"Beltrami, Clay, Clearwater, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Wilkin",,"Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Sandhill River, Upper Red River of the North",http://www.legacy.mn.gov/projects/real-time-water-quality-monitoring-red-river-north-fargo-and-grand-foks-nd-2012-2013,,,, 1306,"Red River of the North Basin-Major Watershed Load Monitoring",2011,60915,,,,,,,,,,,.30,"International Water Institute","Non-Profit Business/Entity","This project will support water quality monitoring and data analysis in nine major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs. ",,,2011-03-01,2012-02-28,"Clean Water Fund",Completed,,,Danni,Halvorson,"International Water Institute",,,,,"(218) 280-0515",dannihalvorson@wiktel.com,"Monitoring, Planning, Technical Assistance","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Kittson, Mahnomen, Marshall, Pennington, Polk, Red Lake, Roseau",,"Clearwater River, Red River of the North - Grand Marais Creek, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Two Rivers",http://www.legacy.mn.gov/projects/red-river-north-basin-major-watershed-load-monitoring,,,, 10009862,"Red River Basin River Watch ",2018,125000,,,,,,,,,,,1.25,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ","Non-point source pollution is the leading source of water quality impacts on rivers and lakes.  In the Red River Valley, as elsewhere in Minnesota, citizen involvement is crucial to identifying and reducing problems from non-point source pollution. This project will build on the foundation of the existing Red River Basin River Watch program.   The River Watch program will be delivered through an effective working partnership between local schools and communities; local, state, and federal agencies; and academic institutions throughout the Red River Basin. The Red River Watershed Management Board will be the project sponsor with lead coordination and project management provided by the International Water Institute (IWI). ",,2018-01-29,2024-06-30,"Clean Water Fund","In Progress",,,Danni,Halverson,"Red River Watershed Management Board ","11 East 5th Ave",Ada,MN,56510,"(218) 290-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River - Red River Basin, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch,,,, 10009862,"Red River Basin River Watch ",2019,125000,,,,,,,,,,,1.25,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ","Non-point source pollution is the leading source of water quality impacts on rivers and lakes.  In the Red River Valley, as elsewhere in Minnesota, citizen involvement is crucial to identifying and reducing problems from non-point source pollution. This project will build on the foundation of the existing Red River Basin River Watch program.   The River Watch program will be delivered through an effective working partnership between local schools and communities; local, state, and federal agencies; and academic institutions throughout the Red River Basin. The Red River Watershed Management Board will be the project sponsor with lead coordination and project management provided by the International Water Institute (IWI). ",,2018-01-29,2024-06-30,"Clean Water Fund","In Progress",,,Danni,Halverson,"Red River Watershed Management Board ","11 East 5th Ave",Ada,MN,56510,"(218) 290-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River - Red River Basin, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch,,,, 10009862,"Red River Basin River Watch ",2020,150000,,,,,,,,,,,1.5,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ","Non-point source pollution is the leading source of water quality impacts on rivers and lakes.  In the Red River Valley, as elsewhere in Minnesota, citizen involvement is crucial to identifying and reducing problems from non-point source pollution. This project will build on the foundation of the existing Red River Basin River Watch program.   The River Watch program will be delivered through an effective working partnership between local schools and communities; local, state, and federal agencies; and academic institutions throughout the Red River Basin. The Red River Watershed Management Board will be the project sponsor with lead coordination and project management provided by the International Water Institute (IWI). ",,2018-01-29,2024-06-30,"Clean Water Fund","In Progress",,,Danni,Halverson,"Red River Watershed Management Board ","11 East 5th Ave",Ada,MN,56510,"(218) 290-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River - Red River Basin, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch,,,, 10009862,"Red River Basin River Watch ",2021,150000,,,,,,,,,,,1.5,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ","Non-point source pollution is the leading source of water quality impacts on rivers and lakes.  In the Red River Valley, as elsewhere in Minnesota, citizen involvement is crucial to identifying and reducing problems from non-point source pollution. This project will build on the foundation of the existing Red River Basin River Watch program.   The River Watch program will be delivered through an effective working partnership between local schools and communities; local, state, and federal agencies; and academic institutions throughout the Red River Basin. The Red River Watershed Management Board will be the project sponsor with lead coordination and project management provided by the International Water Institute (IWI). ",,2018-01-29,2024-06-30,"Clean Water Fund","In Progress",,,Danni,Halverson,"Red River Watershed Management Board ","11 East 5th Ave",Ada,MN,56510,"(218) 290-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River - Red River Basin, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch,,,, 10009862,"Red River Basin River Watch ",2022,150000,,,,,,,,,,,1.12,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ","Non-point source pollution is the leading source of water quality impacts on rivers and lakes.  In the Red River Valley, as elsewhere in Minnesota, citizen involvement is crucial to identifying and reducing problems from non-point source pollution. This project will build on the foundation of the existing Red River Basin River Watch program.   The River Watch program will be delivered through an effective working partnership between local schools and communities; local, state, and federal agencies; and academic institutions throughout the Red River Basin. The Red River Watershed Management Board will be the project sponsor with lead coordination and project management provided by the International Water Institute (IWI). ",,2018-01-29,2024-06-30,"Clean Water Fund","In Progress",,,Danni,Halverson,"Red River Watershed Management Board ","11 East 5th Ave",Ada,MN,56510,"(218) 290-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River - Red River Basin, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch,,,, 10009862,"Red River Basin River Watch ",2023,150000,,,,,,,,,,,2.25,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ","Non-point source pollution is the leading source of water quality impacts on rivers and lakes.  In the Red River Valley, as elsewhere in Minnesota, citizen involvement is crucial to identifying and reducing problems from non-point source pollution. This project will build on the foundation of the existing Red River Basin River Watch program.   The River Watch program will be delivered through an effective working partnership between local schools and communities; local, state, and federal agencies; and academic institutions throughout the Red River Basin. The Red River Watershed Management Board will be the project sponsor with lead coordination and project management provided by the International Water Institute (IWI). ",,2018-01-29,2024-06-30,"Clean Water Fund","In Progress",,,Danni,Halverson,"Red River Watershed Management Board ","11 East 5th Ave",Ada,MN,56510,"(218) 290-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River - Red River Basin, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch,,,, 10009863,"Red River Basin River Watch FY16",2016,200000,,,,,,,,,,,2,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ",,,2015-10-15,2018-06-30,"Clean Water Fund",Completed,,,Danni,Halverson,"Red River Watershed Management Board ","40048 160th Ave SE",Erskine,MN,56535,"(218) 280-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch-fy16,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2016,523135,,,,,,,,,,,3.32,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2018,288451,,,,,,,,,,,1.66,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2019,201398,,,,,,,,,,,1.66,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2020,243164,,,,,,,,,,,1.56,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2021,243164,,,,,,,,,,,1.56,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2022,463456,,,,,,,,,,,1.57,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2024,268352,,,,,,,,,,,1.57,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 503,"Red River Basin River Watch FY10-FY11",2010,346000,"M.L. 2009, Chp. 172, Art. 2, Sec. 4 (i)","$150,000 the first year and $196,000 the second year are for grants to the Red River Watershed Management Board to enhance and expand existing river watch activities in the Red River of the North. The Red River Watershed Management Board shall provide a report that includes formal evaluation results from the river watch program to the commissioners of education and the Pollution Control Agency and to the legislative natural resources finance and policy committees and K-12 finance and policy committees by February 15, 2011.",,,,,,,,,1.5,"Red River Watershed Management Board","Local/Regional Government","This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building. The River Watch program will be delivered through an effective working partnership between local schools and communities; local, state, and federal agencies; and academic institutions throughout the Red River Basin.","Check out the International Water Institute site for details on this issue.","See Activities",2009-07-01,2012-06-30,"Clean Water Fund",Completed,,"CR2849 ""AttachA"" Work Plan - Final",Wayne,Goeken,"Red River Watershed Management Board","40048 160th Ave. SE",Erskine,MN,,"(218) 574-2622",wrg@gvtel.com,"Education/Outreach/Engagement, Planning","Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Itasca, Kittson, Koochiching, Lake of the Woods, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers, Upper Red River of the North, Upper/Lower Red Lake, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch-fy10-fy11,,,, 28125,"Red Lake Watershed District FY 14 Surface Water Assessment Grant",2014,77429,,,,,,,,,,,0.39,"Red Lake Watershed District","Local/Regional Government","The Clearwater River Watershed in northwestern Minnesota is a targeted watershed for the 2014-15 Surface Water Assessment Grant (SWAG) funding. A partnership of local agencies will monitor water quality at the targeted sites within this watershed that are listed in Appendix C of the 2014 Surface Water Assessment Grants (SWAG) Request for Proposal (RFP) document. Fifteen monitoring sites have been chosen within the Clearwater River watershed. Each of these sites will provide a representative assessment of the water quality within one or more minor subwatersheds at the aggregated 12-digit hydrologic unit code (HUC12) level. The Red Lake Watershed District will be open to any post-RFP changes requested by the MPCA IWM biologist and will incorporate them into the SWAG work plan.",,"Clearwater River Watershed",2014-03-24,2016-03-31,"Clean Water Fund",Completed,,,Corey,Hanson,"Red Lake Watershed District","1000 Pennington Avenue S. ","Thief River Falls",MN,56701,"(218) 681-5800",,Monitoring,"Minnesota Pollution Control Agency",,"Red Lake",,"Clearwater River",http://www.legacy.mn.gov/projects/red-lake-watershed-district-fy-14-surface-water-assessment-grant,,,, 879,"Red River Watershed Management Board (RRWMB) Major Watershed Load Monitoring",2010,53199,,,,,,,,,,,.19,"Red River Watershed Management Board","Local/Regional Government","This project will monitor nine locations in the major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The stream outlet monitoring will provide the water chemistry data needed to calculate annual pollutant loads. Staff from the Red River Watershed Management Board (RRWMB) will conduct the sampling, initially manage the data and provide the data to the Minnesota Pollution Control Agency (MPCA) for load calculations and import into the STORET data system. ",,,2010-03-30,2011-06-30,"Clean Water Fund",Completed,,,"Wayne ",Goeken,"Red River Watershed Management Board",,,,,"(218) 574-2622",wrg@gvtel.com,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Kittson, Mahnomen, Marshall, Norman, Pennington, Polk, Red Lake, Roseau",,"Clearwater River, Red River of the North - Grand Marais Creek, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Two Rivers",http://www.legacy.mn.gov/projects/red-river-watershed-management-board-rrwmb-major-watershed-load-monitoring,,,, 37682,"Red Lake River and Tributaries Hydrological Simulation Program – FORTRAN (HSPF) Model Update",2017,49999,,,,,,,,,,,0.23,RESPEC,"For-Profit Business/Entity","The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds. ",,"Clearwater River Watershed Red Lake River Watershed Thief River Watershed Upper/Lower Red Lake Watershed ",2017-05-17,2018-06-29,"Clean Water Fund",Completed,,,Michael,Vavricka,MPCA,"714 Lake Ave Ste 220","Detroit Lakes",MN,56501,"(218) 846-8137",,Modeling,"Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Mahnomen, Marshall, Pennington, Polk, Red Lake",,"Clearwater River, Red Lake River, Thief River, Upper/Lower Red Lake",http://www.legacy.mn.gov/projects/red-lake-river-and-tributaries-hydrological-simulation-program-fortran-hspf-model-update,,,, 9575,"Red River Basin Event Based Monitoring",2012,272267,,,,,,,,,,,.20,"International Water Institute","Non-Profit Business/Entity","International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit. ",,,2012-02-01,2014-06-30,"Clean Water Fund",Completed,,,Danni,Halvorson,"International Water Institute",,,,,"(218) 280-0515",danni@iwinst.org,"Analysis/Interpretation, Assessment/Evaluation, Monitoring, Planning","Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Mustinka River, Red Lake River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Thief River",http://www.legacy.mn.gov/projects/red-river-basin-event-based-monitoring,,,, 9575,"Red River Basin Event Based Monitoring",2014,359367,,,,,,,,,,,,"International Water Institute","Non-Profit Business/Entity","International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit. ",,,2012-02-01,2014-06-30,"Clean Water Fund",Completed,,,Danni,Halvorson,"International Water Institute",,,,,"(218) 280-0515",danni@iwinst.org,"Analysis/Interpretation, Assessment/Evaluation, Monitoring, Planning","Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Mustinka River, Red Lake River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Thief River",http://www.legacy.mn.gov/projects/red-river-basin-event-based-monitoring,,,, 9759,"Red River Basin River Watch FY12",2012,200000,,"MN Laws 2011, 1st Special Session, Chapter 6, Article 2, Section 5.  $100,000 the first year and $100,000 the second year are for grants to the Red River Watershed Management Board to enhance and expand the existing water quality and watershed monitoring river watch activities in the schools in the Red River of the North. The Red River Watershed Management Board shall provide a report to the commissioner of the Pollution Control Agency and the legislative committees and divisions with jurisdiction over environment and natural resources finance and policy and the clean water fund by February 15, 2013, on the expenditure of these funds.",,,,,,,,,1.76,"Red River Watershed Management Board","Non-Profit Business/Entity","MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ",,,2012-04-02,2013-12-31,"Clean Water Fund",Completed,,,"Naomi ",Erickson,"Red River Watershed Management Board",,,,,"(218) 844-6166","rrwmb@arvig.net ","Analysis/Interpretation, Assessment/Evaluation, Education/Outreach/Engagement, Monitoring","Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Lake of the Woods, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Thief River, Two Rivers, Upper Red River of the North, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch-fy12,,,, 36599,"Red River of the North Stressor Response Modeling",2016,19860,,,,,,,,,,,.08,"Buffalo-Red River Watershed District","Local/Regional Government","The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.",,"Bois de Sioux River WatershedMustinka River WatershedOtter Tail River WatershedUpper Red River of the North WatershedBuffalo River WatershedRed River of the North - Marsh River WatershedWild Rice River WatershedRed River of the North - Sandhill River WatershedUpper/Lower Red Lake WatershedRed Lake River WatershedThief River WatershedClearwater River WatershedRed River of the North - Grand Marais Creek WatershedSnake River - St. Croix Basin WatershedRed River of the North - Tamarac River WatershedTwo Rivers WatershedRoseau River Watershed",2015-08-10,2015-12-31,"Clean Water Fund",Completed,,,Bruce,Albright,"Buffalo-Red River Watershed District","PO Box 341 ",Barnesville,MN,56514,"(218) 354-7710",,"Assessment/Evaluation, Monitoring, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Beltrami, Clay, Clearwater, Douglas, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Pope, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers, Upper Red River of the North, Upper/Lower Red Lake, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-north-stressor-response-modeling,,,, 23879,"Red River Basin River Watch FY14",2014,100000,,,,,,,,,,,0.82,"Red River Watershed Management Board","Local/Regional Government","The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.",,,2013-10-07,2016-06-30,"Clean Water Fund",Completed,,,Naomi,Erickson,"Red River Watershed Management Board","40048 160th Avenue SE ",Erskine,MN,56535,,,"Education/Outreach/Engagement, Monitoring, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Red Lake River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch-fy14,,,, 23889,"Red River Basin River Watch FY15",2015,100000,,,,,,,,,,,0.82,"Red River Watershed Management Board","Local/Regional Government","The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.",,,2013-10-07,2016-06-30,"Clean Water Fund",Completed,,,Naomi,Erickson,"Red River Watershed Management Board","40048 160th Avenue SE ",Erskine,MN,56535,,,"Education/Outreach/Engagement, Monitoring, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Red Lake River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch-fy15,,,, 31195,"Red Lakes Hydrological Simulation Program FORTRAN (HSPF) Modeling",2016,99991,,,,,,,,,,,0.46,RESPEC,"For-Profit Business/Entity","The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.",,"Upper/Lower Red Lake Watershed",2015-09-07,2016-06-30,"Clean Water Fund",Completed,,,Michael,Vavricka,"MPCA Detroit Lakes Office","714 Lake Street, Suite 220","Detroit Lakes",MN,56501,"(218) 846-8137",,Modeling,"Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Itasca, Koochiching",,"Upper/Lower Red Lake",http://www.legacy.mn.gov/projects/red-lakes-hydrological-simulation-program-fortran-hspf-modeling,,,, 23546,"Sediment Reduction Strategies for the Minnesota and Mississippi Rivers",2014,29932,,,,,,,,,,,.14,LimnoTech,"For-Profit Business/Entity","The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.",,,2013-11-01,2014-02-22,"Clean Water Fund",Completed,,,"Larry ",Gunderson,MPCA,"520 Lafayette Road North ","St. Paul",MN,55155,651-757-2400,,"Assessment/Evaluation, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Big Stone, Blue Earth, Brown, Carlton, Cass, Chippewa, Chisago, Clearwater, Cottonwood, Crow Wing, Dakota, Douglas, Faribault, Freeborn, Goodhue, Grant, Hennepin, Hubbard, Isanti, Itasca",,"Blue Earth River, Cannon River, Chippewa River, Cottonwood River, Crow Wing River, Kettle River, Lac qui Parle River, Le Sueur River, Leech Lake River, Long Prairie River, Lower Minnesota River , Lower St. Croix River, Minnesota River - Headwaters, Minnesota River - Mankato, Minnesota River - Yellow Medicine River, Mississippi River - Brainerd, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mississippi River - Lake Pepin, Mississippi River - Sartell, Mississippi River - St. Cloud, Mississippi River - Twin Cities, North Fork Crow River, Pine River, Pomme de Terre River, Redeye River, Redwood River, Sauk River, Snake River, Upper St. Croix River, Watonwan River",http://www.legacy.mn.gov/projects/sediment-reduction-strategies-minnesota-and-mississippi-rivers-0,,,, 28144,"Snake River & Grand Marais Creek Hydrologic Simulation Program FORTRAN (HSPF) Modeling",2015,100000,,,,,,,,,,,0.46,RESPEC,"For-Profit Business/Entity","Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process. ",,"Snake River - Red River Basin Watershed",2014-08-04,2015-07-31,"Clean Water Fund",Completed,,,"Michael ",Vavricka,"MPCA Detroit Lakes Office","714 Lake Street, Suite 220","Detroit Lakes",MN,56501,"(218) 846-8137",,Modeling,"Minnesota Pollution Control Agency",,"Marshall, Pennington, Polk, Red Lake",,"Snake River",http://www.legacy.mn.gov/projects/snake-river-grand-marais-creek-hydrologic-simulation-program-fortran-hspf-modeling,,,, 1319,"SWAG 11-Red Lake County SWCD SWAG Monitoring Program",2011,34366,,,,,,,,,,,.63,"Red Lake County Soil and Water Conservation District","Local/Regional Government","This project will complete the dataset necessary for assessment of water quality on Brooks Creek, Black River, Lost River, Poplar River, and Hill River. By monitoring these five sites, Red Lake County SWCD will have collected baseline information on all of the Streams/Creeks in Red Lake County.",,,2011-03-15,2013-06-30,"Clean Water Fund",Completed,,,Tanya,Hanson,"Red Lake County SWCD",,,,,"(218) 253-2593",tanya.hanson@mn.nacdnet.net,"Assessment/Evaluation, Monitoring","Minnesota Pollution Control Agency",,"Red Lake",,"Clearwater River",http://www.legacy.mn.gov/projects/swag-11-red-lake-county-swcd-swag-monitoring-program,,,, 847,"SWAG 10- Becker County Lake and Stream Monitoring",2010,19176,,,,,,,,,,,.08,"Becker County Soil and Water Conservation District","Local/Regional Government","This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake. This project will complete a lake data set for 303(d) and Aquatic Recreation use assessments in Becker County by monitoring total phosphorus, chlorophyll-a and Secchi depth on 3 lakes and evaluate the stream inlet to White Earth Lake.",,,2010-03-15,2012-06-30,"Clean Water Fund",Completed,,,"Brad ",Grant,"Becker County Soil and Water Conservation District",,,,,"(218) 846-7360",blgrant@co.becker.mn.us,Monitoring,"Minnesota Pollution Control Agency",,"Becker, Cass, Clay, Clearwater, Crow Wing, Hubbard, Mahnomen, Morrison, Norman, Otter Tail, Polk, Todd, Wadena",,"Crow Wing River, Wild Rice River",http://www.legacy.mn.gov/projects/swag-10-becker-county-lake-and-stream-monitoring,,,, 851,"SWAG 10- Wild Rice Watershed Surface Water Monitoring Program",2010,50364,,,,,,,,,,,.27,"Norman County Soil and Water Conservation District","Local/Regional Government","This project will obtain lab and field data for waterbodies within the Wild Rice Watershed, to meet surface water assessment goals. Data will continue to be collected further upstream of some 2008 sites and enhance current assessment datasets. Some new tributaries, that lack assessment data, will also be monitored. The project goal is to complete the datasets necessary for the assessment of Aquatic Recreation Use for twelve streams in the Wild Rice Watershed.",,,2010-03-15,2012-06-30,"Clean Water Fund",Completed,,,"Curtis ",Borchert,"Norman County Soil and Water Conservation District",,,,,"(218) 584-5169",borchert@arvig.net,Monitoring,"Minnesota Pollution Control Agency",,"Becker, Clay, Clearwater, Mahnomen, Norman, Polk",,"Wild Rice River",http://www.legacy.mn.gov/projects/swag-10-wild-rice-watershed-surface-water-monitoring-program,,,, 9653,"SWAG 12- Red Lake River and Grand Marais Creek Assessment",2012,86514,,,,,,,,,,,.25,"Red Lake Watershed District","Local/Regional Government","A partnership of local agencies and organizations will monitor water quality at eighteen carefully chosen sites within the Red Lake River and Grand Marais Creek watersheds. Fourteen monitoring sites have been chosen within the Red Lake River watershed. Four sites have been chosen in the Grand Marais Creek watershed. Each of these sites will provide a representative assessment of the water quality conditions within one or more minor subwatersheds at the 12-digit hydrologic unit code (HUC12) level. ",,,2012-02-24,2014-06-30,"Clean Water Fund",Completed,,,Myron,Jesme,"Red Lake Watershed District",,,,,"(218) 681-5800",jesme@wiktel.com,"Analysis/Interpretation, Monitoring","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Marshall, Pennington, Polk, Red Lake",,"Red Lake River, Red River of the North - Grand Marais Creek",http://www.legacy.mn.gov/projects/swag-12-red-lake-river-and-grand-marais-creek-assessment,,,, 627,"SWAG-10 Hubbard County Surface Water Assessment Grant 2010",2010,11509,,,,,,,,,,,.08,"Hubbard County Soil and Water Conservation District","Local/Regional Government","This project will collect water quality data for 13 Hubbard County lakes located in the Crow Wing priority watershed and identified as priority lakes by the MPCA. Upon completion the project data set will include all of the necessary information for the lakes to be assessed for impairment due to nutrients. Volunteers will collect samples from 7 of the 13 lakes and paid SWCD staff will collect samples from 6 of the lakes that do not have public access or volunteers willing to sample. The water samples will be collected 5 times/year June-September in 2010 and 2011. ",,,2010-03-30,2012-06-30,"Clean Water Fund",Completed,,,"Shane ",Foley,"Hubbard County Soil and Water Conservation District",,,,,"(218) 732-0121",shane.foley@mn.nacdnet.net,Monitoring,"Minnesota Pollution Control Agency",,"Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd, Wadena",,"Crow Wing River",http://www.legacy.mn.gov/projects/swag-10-hubbard-county-surface-water-assessment-grant-2010,,,, 1352,"Upper Mississippi River Bacteria TMDL-- Phase IIA",2011,53000,,,,,,,,,,,.21,"Emmons and Olivier Resources, Inc. ","For-Profit Business/Entity","This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.",,,2011-02-01,2011-06-30,"Clean Water Fund",Completed,,,Barb,Peichel,"Minnesota Pollution Control Agency",,,,,651-757-2646,Barbara.Peichel@state.mn.us,Assessment/Evaluation,"Minnesota Pollution Control Agency",,"Aitkin, Anoka, Becker, Beltrami, Benton, Carlton, Carver, Cass, Chisago, Clearwater, Crow Wing, Douglas, Hennepin, Hubbard, Isanti, Itasca, Kanabec, Kandiyohi, McLeod, Meeker, Mille Lacs, Morrison, Otter Tail, Pope, Renville, Sherburne, Sibley, Stearns, Todd, Wadena, Wright",,"Crow Wing River, Leech Lake River, Long Prairie River, Mississippi River - Brainerd, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mississippi River - Sartell, Mississippi River - St. Cloud, North Fork Crow River, Pine River, Redeye River, Rum River, Sauk River, South Fork Crow River",http://www.legacy.mn.gov/projects/upper-mississippi-river-bacteria-tmdl-phase-iia,,,, 29760,"Upper/Lower Red Lake Watershed Restoration and Protection Strategy (WRAPS)",2015,121943,,,,,,,,,,,0.53,"Red Lake Department of Natural Resources","Tribal Government ","The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed. ",,"Upper/Lower Red Lake Watershed ",2015-05-15,2017-05-15,"Clean Water Fund",Completed,,,Kayla,Bowe,"Red Lake Department of Natural Resources","1576 High School Drive","Red Lake",MN,56671,"(218) 679-1607",,"Analysis/Interpretation, Assessment/Evaluation, Education/Outreach/Engagement, Monitoring, Planning","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Itasca, Koochiching",,"Upper/Lower Red Lake",http://www.legacy.mn.gov/projects/upperlower-red-lake-watershed-restoration-and-protection-strategy-wraps,,,, 29760,"Upper/Lower Red Lake Watershed Restoration and Protection Strategy (WRAPS)",2017,184960,,,,,,,,,,,.76,"Red Lake Department of Natural Resources","Tribal Government ","The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed. ",,"Upper/Lower Red Lake Watershed ",2015-05-15,2017-05-15,"Clean Water Fund",Completed,,,Kayla,Bowe,"Red Lake Department of Natural Resources","1576 High School Drive","Red Lake",MN,56671,"(218) 679-1607",,"Analysis/Interpretation, Assessment/Evaluation, Education/Outreach/Engagement, Monitoring, Planning","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Itasca, Koochiching",,"Upper/Lower Red Lake",http://www.legacy.mn.gov/projects/upperlower-red-lake-watershed-restoration-and-protection-strategy-wraps,,,, 10013338,"Upper/Lower Red Lake Watershed Restoration and Protection Strategy (WRAPS) Public Notice",2020,7451,,,,,,,,,,,.03,"Emmons and Olivier Resources, Inc.","For-Profit Business/Entity","This project is for the editing the draft Watershed Restoration and Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval. ",,"Upper/Lower Red Lake Watershed ",2020-06-22,2021-01-29,"Clean Water Fund",Completed,,,Denise,Oakes,"Minnesota Pollution Control Agency","714 Lake Ave Ste 220","Detroit Lakes",MN,56501,"(218) 846-8119",,"Assessment/Evaluation, Planning, Technical Assistance","Minnesota Pollution Control Agency",,"Beltrami, Clearwater, Itasca, Koochiching",,"Upper/Lower Red Lake",https://www.legacy.mn.gov/projects/upperlower-red-lake-watershed-restoration-and-protection-strategy-wraps-public-notice,,,, 33260,"Upper Mississippi Hydrological Simulation Program - FORTRAN (HSPF) Recalibration and Extension",2016,71525,,,,,,,,,,,0.46,RESPEC,"For-Profit Business/Entity","This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds. ",,"South Fork Crow River WatershedPine River WatershedMississippi River - Headwaters WatershedLeech Lake River Watershed",2016-01-25,2016-06-30,"Clean Water Fund",Completed,,,"Charles P",Regan,"MPCA ST. Paul Office","520 Lafayette Road N.","St. Paul",MN,55155,"(651) 757-2866",,Modeling,"Minnesota Pollution Control Agency",,"Aitkin, Becker, Beltrami, Carver, Cass, Clearwater, Crow Wing, Hennepin, Hubbard, Itasca, Kandiyohi, McLeod, Meeker, Renville, Sibley, Wright",,"Leech Lake River, Mississippi River - Headwaters, Pine River, South Fork Crow River",http://www.legacy.mn.gov/projects/upper-mississippi-hydrological-simulation-program-fortran-hspf-recalibration-and-extension,,,, 37685,"Upper Mississippi River Basin Hydrological Simulation Program – FORTRAN (HSPF) Revision 2017 ",2017,134960,,,,,,,,,,,0.34,"Tetra Tech Inc","For-Profit Business/Entity","The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration. ",,"Crow Wing River Watershed Leech Lake River Watershed Long Prairie River Watershed Mississippi River - Brainerd Watershed Mississippi River - Grand Rapids Watershed Mississippi River - Headwaters Watershed Mississippi River - Sartell Watershed Mississippi River - St. Cloud Watershed Pine River Watershed Redeye River Watershed ",2017-06-05,2019-06-28,"Clean Water Fund",Completed,,,Chuck,Regan,MPCA,"520 Lafayette Rd N","Saint Paul",MN,"55155 ","(651) 757-2866",,Modeling,"Minnesota Pollution Control Agency",,"Aitkin, Becker, Beltrami, Benton, Carlton, Cass, Clearwater, Crow Wing, Douglas, Hubbard, Itasca, Mille Lacs, Morrison, Otter Tail, Pine, Sherburne, St. Louis, Stearns, Todd, Wadena",,"Crow Wing River, Leech Lake River, Long Prairie River, Mississippi River - Brainerd, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mississippi River - Sartell, Mississippi River - St. Cloud, Pine River, Redeye River",http://www.legacy.mn.gov/projects/upper-mississippi-river-basin-hydrological-simulation-program-fortran-hspf-revision-2017,,,, 37729,"Wild Rice River Watershed Restoration and Protection Strategy (WRAPS) - Phase 2",2018,99997,,,,,,,,,,,.43,"Wild Rice Watershed District","Local/Regional Government","Phase 2 of the Wild Rice River Watershed Restoration and Protection Strategy (WRAPS) project includes: continued civic engagement; production of the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; and production of the WRAPS report, which identifies implementation strategies that will maintain or improve water quality in many lakes and streams throughout the watershed. ",,"Wild Rice River Watershed ",2017-10-10,2020-09-30,"Clean Water Fund",Completed,,,Kevin,Ruud,"Wild Rice Watershed District ","11 5th Ave E",Ada,MN,56510,"(218) 784-5501",,"Education/Outreach/Engagement, Planning","Minnesota Pollution Control Agency",,"Becker, Clay, Clearwater, Mahnomen, Norman",,"Wild Rice River",http://www.legacy.mn.gov/projects/wild-rice-river-watershed-restoration-and-protection-strategy-wraps-phase-2,,,, 28142,"Wild Rice Watershed District Watershed Restoration and Protection Strategy (WRAPS)",2015,109472,,,,,,,,,,,0.48,"Wild Rice Watershed District","Local/Regional Government","Assesss current data sources and preliminary information about the conditions in the watershed and present the information through bibliographies, abstracts and memos. ",,"Wild Rice River Watershed ",2014-08-01,2016-06-30,"Clean Water Fund",Completed,,,Jeremiah,Jazdzewski,"Wild Rice Watershed District","11 East 5th Avenue ",Ada,MN,56510,"(218) 784-5501",,"Assessment/Evaluation, Education/Outreach/Engagement, Planning, Restoration/Enhancement","Minnesota Pollution Control Agency",,"Becker, Clay, Clearwater, Mahnomen, Norman",,"Wild Rice River",http://www.legacy.mn.gov/projects/wild-rice-watershed-district-watershed-restoration-and-protection-strategy-wraps,,,,