"ID","Title","Fiscal Year(s)","Fiscal Year Funding Amount","Legal Citation / Subdivision","Appropriation Language","Proposed Measurable Outcome(s)","Measurable Outcome(s)","Proposed Outcomes Achieved","Other Funds Leveraged","Source of Additional Funds","Direct Expenses","Administration Costs","Recipient Board Members","Number of full time equivalents funded","Recipient","Recipient Type","Body","About the Issue","Project Details","Start Date","End Date","Source","Status","Updates","Details/Reports","First Name","Last Name","Organization Name","Street Address","City","State","Zip Code","Phone","Email","Activity Type","Administered by","Media","Counties Affected","LSOHC Section","Watershed","URL","Advisory Group Members and Qualifications","Board Members and Qualifications","Conflict of Interest Contact","Conflict of Interest Disclosed" 33248,"Minnesota River Headwaters Watershed Project - Phase 2",2016,228013,,,,,,,,,,,2.48,"Upper Minnesota River Watershed District","Local/Regional Government","The goal of this project is to develop a Watershed Restoration and Protection Plan (WRAPS) to be used at the local level. It will increase the number of citizens participating in education and outreach events; foster information and idea exchange around watershed issues through relationships and social networks; involve community members in crafting civic engagement activities/plans in which they feel ownership and desire to implement; and promote awareness, concern, and watershed stewardship to community organizations/institutions.",,"Mississippi River - Headwaters Watershed ",2015-10-01,2020-06-30,"Clean Water Fund",Completed,,,Dianne,Radermacher,"Upper Minnesota River Watershed District","211 2nd Street SE",Ortonville,MN,56278,"(320) 839-3411",,"Assessment/Evaluation, Education/Outreach/Engagement, Technical Assistance","Minnesota Pollution Control Agency",,"Big Stone, Chippewa, Lac qui Parle, Stevens, Swift, Traverse",,"Mississippi River - Headwaters",http://www.legacy.mn.gov/projects/minnesota-river-headwaters-watershed-project-phase-2,,,, 33254,"Mustinka River Watershed Total Maximum Daily Load (TMDL) and Watershed Restoration & Protection Strategy (WRAPS) Pre Public Notice Revision",2016,7329,,,,,,,,,,,0.03,"Emmons & Oliver Resources (EOR)","For-Profit Business/Entity","This project will address United States Environmental Protection Agency (USEPA) comments on the Preliminary Draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft Watershed Restoration & Protection Strategy (WRAPS) report, and produce Public Notice Draft TMDL study and Public Notice Draft WRAPS report ready for public review and comment. ",,"Mustinka River Watershed",2015-10-20,2015-12-30,"Clean Water Fund",Completed,,,"Cary G",Hernandez,"MPCA Detroit Lakes Office","714 Lake Street, Suite 220","Detroit Lakes",MN,56501,"(218) 846-8124",,"Technical Assistance","Minnesota Pollution Control Agency",,"Big Stone, Grant, Otter Tail, Stevens, Traverse",,"Mustinka River",http://www.legacy.mn.gov/projects/mustinka-river-watershed-total-maximum-daily-load-tmdl-and-watershed-restoration-protection,,,, 10009863,"Red River Basin River Watch FY16",2016,200000,,,,,,,,,,,2,"Red River Watershed Management Board","Local/Regional Government","This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin. ",,,2015-10-15,2018-06-30,"Clean Water Fund",Completed,,,Danni,Halverson,"Red River Watershed Management Board ","40048 160th Ave SE",Erskine,MN,56535,"(218) 280-0515",,Education/Outreach/Engagement,"Minnesota Pollution Control Agency",,"Becker, Beltrami, Big Stone, Clay, Clearwater, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-basin-river-watch-fy16,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2016,523135,,,,,,,,,,,3.32,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2018,288451,,,,,,,,,,,1.66,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2019,201398,,,,,,,,,,,1.66,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2020,243164,,,,,,,,,,,1.56,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2021,243164,,,,,,,,,,,1.56,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2022,463456,,,,,,,,,,,1.57,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 10008289,"Red and Upper Mississippi Watershed Pollutant Load Monitoring",2024,268352,,,,,,,,,,,1.57,"International Water Institute","Local/Regional Government","The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow. Monitoring will follow the sampling frequency and the parameter list provided by the Minnesota Pollution Control Agency (MPCA) in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. Load calculations for each site will also be completed using the FLUX32 model. Loading information will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters. ",,"Watershed Pollutant Load Monitoring Network ",2016-01-15,2026-06-30,"Clean Water Fund",Ongoing,,,Danni,Halvorson,"International Water Institute","1120 28th Avenue North Suite B",Fargo,ND,58102,"(218) 280-0515",,Monitoring,"Minnesota Pollution Control Agency",,"Beltrami, Cass, Grant, Itasca, Kittson, Marshall, Norman, Otter Tail, Pennington, Polk, Red Lake, Traverse, Wilkin",,"Bois de Sioux River, Clearwater River, Leech Lake River, Mississippi River - Grand Rapids, Mississippi River - Headwaters, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers",https://www.legacy.mn.gov/projects/red-and-upper-mississippi-watershed-pollutant-load-monitoring,,,, 36599,"Red River of the North Stressor Response Modeling",2016,19860,,,,,,,,,,,.08,"Buffalo-Red River Watershed District","Local/Regional Government","The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.",,"Bois de Sioux River WatershedMustinka River WatershedOtter Tail River WatershedUpper Red River of the North WatershedBuffalo River WatershedRed River of the North - Marsh River WatershedWild Rice River WatershedRed River of the North - Sandhill River WatershedUpper/Lower Red Lake WatershedRed Lake River WatershedThief River WatershedClearwater River WatershedRed River of the North - Grand Marais Creek WatershedSnake River - St. Croix Basin WatershedRed River of the North - Tamarac River WatershedTwo Rivers WatershedRoseau River Watershed",2015-08-10,2015-12-31,"Clean Water Fund",Completed,,,Bruce,Albright,"Buffalo-Red River Watershed District","PO Box 341 ",Barnesville,MN,56514,"(218) 354-7710",,"Assessment/Evaluation, Monitoring, Technical Assistance","Minnesota Pollution Control Agency",,"Becker, Beltrami, Clay, Clearwater, Douglas, Grant, Kittson, Mahnomen, Marshall, Norman, Otter Tail, Pennington, Polk, Pope, Red Lake, Roseau, Stevens, Traverse, Wilkin",,"Bois de Sioux River, Buffalo River, Clearwater River, Mustinka River, Otter Tail River, Red Lake River, Red River of the North - Grand Marais Creek, Red River of the North - Marsh River, Red River of the North - Sandhill River, Red River of the North - Tamarac River, Roseau River, Snake River, Thief River, Two Rivers, Upper Red River of the North, Upper/Lower Red Lake, Wild Rice River",http://www.legacy.mn.gov/projects/red-river-north-stressor-response-modeling,,,, 34328,"Source Water Protection Plan Implementation Grant",2016,543,"Chapter 2 - S.F. No 1; Art 2; Sec 8 (b) MSL 2015","$1,900,000 the first year and $1,900,000 the second year are for protection of drinking water sources","Protect the drinking water source","Protect the drinking water source",,,N/A,543,,N/A,,"City of Browns Valley","Local/Regional Government","Seal wells on private property; Educate businesses about proper tank management; Provide DWSMA map to MPCA tank units; Above ground storage tanks - updated rules and regulations; educate businesses; Provide DWSMA map to road authorities; WHP education and",,,2016-06-01,2017-04-30,"Clean Water Fund",Completed,,,Thomas,Schmitz,"City of Browns Valley","19 3rd Street So.","Browns Valley",MN,56219,"320 695 2110",tom.schmitz@prtel.com,Grants/Contracts,"Minnesota Department of Health",,Traverse,,,http://www.legacy.mn.gov/projects/source-water-protection-plan-implementation-grant-269,N/A,"James Walsh, Hydrologist Supervisor,Jenilynn Marchand, Planning Program Supervisor,Steve Robertson, Supervisor SWP Unit",N/A,No 34207,"Traverse County Ditch 17",2016,204105,"Laws of MN 2015 1st Special Session Chapter 2, Article 2, Section 7","Multipurpose Drainage Management 2016: Laws of MN 2015 First Special Session Chapter 2, Article 7, Section 7","It is estimated that this project will result in sediment loading will be reduced by 340 tons per year and phosphorus loading reduced by 700 lbs per year . ",,,206745,"LOCAL LEVERAGED FUNDS",204105,,"Members for Bois de Sioux WD are: Allen Wold, Doug Dahlen, Jerome Deal, John Kapphahn, Kurt Erlandson, Linda Vavra, Ron Vold, Scott Gillespie",0.12,"Bois de Sioux WD","Local/Regional Government","The Bois de Sioux Watershed District intends to begin a program to repair the legal ditches it owns and maintains for the purpose of improving water quality within the watershed and downstream receiving waters. The intent of this effort is to complete a pilot project to a legal ditch system that is in disrepair and use it as an example to educate landowners along other legal ditches on the importance of water quality. This pilot project consists of the construction of berms and side inlet culverts for sediment control along Traverse County Ditch #17 (TCD 17) and its single branch (B1) . This modification, also known as a retrofit, will be completed as a repair under MN Statues 103E.021, Subd. 6 which will ensure these erosion control features become a permanent part of the legal ditch. TCD 17 flows west to east and outlets into Twelve Mile Creek eight miles northeast of Wheaton, MN. Twelve Mile Creek flows north to the Mustinka River which ultimately enters Lake Traverse. Twelve Mile Creek and the Mustinka River have well documented issues regarding the exceedance of TMDL for turbidity, phosphorus, and overall poor biota. TCD 17 has a watershed of approximately 4.5 square miles, the land is used primarily for agricultural production. Berms and intercept culverts along legal ditch systems help to prevent sediment transport at the source and reduce turbidity downstream. The TCD 17 retrofit is aimed to be the first of many legal ditch retrofit projects within the BdSWD . By completing this retrofit it is estimated to reduce sediment loading by 340 tons/year and phosphorus loading by 700 lbs/year while working to restore and protect water resources for public use and public health. ",,,2016-03-07,2018-12-31,"Clean Water Fund","In Progress",,,Jon,Roeschlein,"Bois de Sioux WD","704 S Highway 75",Wheaton,MN,56296,320-563-4185,bdswd@frontiernet.net,Grants/Contracts,"Minnesota Board of Water and Soil Resources",,Traverse,,"Mustinka River",http://www.legacy.mn.gov/projects/traverse-county-ditch-17,"See http://www.bwsr.state.mn.us/aboutbwsr/index.html ","See http://www.bwsr.state.mn.us/aboutbwsr/index.html and http://www.bwsr.state.mn.us/aboutbwsr/boarddirectory.pdf ","Nicole Clapp ",